NEW WEB-LOG

The alignment of my skeleton requires, during my workouts, my primary focus. The alignment of the skeleton system is important for efficient running, only then the engagement of essential muscles will be enabled. During one of these workouts, I recognized in the runner’s bio-mechanics, a metaphor for the structure of Machine Projects.


24/02/2014

DETAILED CV

Ship EngineeringMerchant Navy Machinery: C2-Certificate
(equal to HTS-Degree + 11 years practical experience)
Traininga/o technology, personal development and analytically
PracticeMerchant Navy 1958-1969, 5th engineer up to chief engineer.
LanguagesDutch, English:  fluent in speaking and writing
FunctionsShell, Rotating Equipment Engineer, 690701-700701
Shell, Chief of Mechanical Workshop, 700701-760701
Shell, Rotating Equipment Adviser, 760701-820201
Shell, Gas Turbine Adviser, 820201-990131
Consultant, 990131 – 2015.
Office EngineerPreparing and coordinating overhauls of major machinery
Specifications for new machinery: compressors, steam/gas turbines.
Evaluation of bids for new machinery
Bid clarification discussion
Inspection during manufacturing
Witness of performance tests, at factory and/or site
Installation of machinery
Commissioning and start-up of machinery
Inspection / trouble shooting machinery
Performance measurements of machinery
Maintenance / Operation training
Long term maintenance plans, remaining lifetime tables etc.
Field EngineerRule > 30% time has to be field work.
Functions may vary from mechanical supervisor to project leader or coordinator.
Lecturer for Reeds Business 2011-2012 and Hoge School Utrecht 2012.

Project’s
a/o as Site-Manager / Rotating Equipment Adviser:
1999 – Engineering Retrofit BBC 9D1N Gas turbine (GT)
2000 – Replacement of a BBC 8B by BBC 8C GT+ Kralupy-CZ, new construction of a new refinery
2001 – Major Overhaul – Retrofit BBC 9D1N GT
2002 – Major Overhaul - BBC 8C GT
2004 – Emergency repair 7 MW; Wet Gas Compressor (WGC)
2005 – Overhaul BBC 8C GT (Alstom Power)
2006 – Overhaul 7 MW WGC, Overhaul GE  Frame-6 GT; Overhaul Siemens-Worthington-Nuovo Pignone steam turbines and Elliott compressors (MLO turn-around), A-Inspection BBC 9D1N GT
2007 – Overhaul 2 Nuovo Pignone steam turbines
2008 – Preparing overhauls: 2 turbo-compressors and BBC 8C GT
2009 – Preparing Major Overhaul - BBC 8C GT, Josephine-Wapenveld
2010 – Major Overhaul - BBC 8C GT, Josephine-Wapenveld Preparing
– Stork Turbo-Gen-Set, HDT6, Parenco-Renkum
2011 – Major Repair HDT6, Parenco-Renkum
Preparing Major Overhaul (2012) - BBC 8C GT; Retrofit GT101 – GE Frame-6 Shell Moerdijk
2012 –Preparing Major OH C201T Steam Turbine DOW, T’zen;
Repairs Turbo-BFWPumps, Shell-Moerdijk
2013 – Shell, Rotating Equipment Advisor, 130101-130401 Trouble Shooting; Turbo-Gen set bearing problem solved, Eindhoven
2014 –
2015 – End of story.

No comments:

Post a Comment